Form Perspectives — Design & Construction
Design & Construction Phase

Build off reality.
Not assumptions.

Traditional manual measurements introduce errors that snowball into massive change orders. Our LiDAR-verified as-builts replace assumptions with absolute spatial certainty—compressing your schedule and protecting your budget.

±0.5"
Measurement Accuracy
48hr
Average Turnaround
CAD/BIM
Direct Integrations
Built for AOC Teams. Architects, Owners, Facility Managers, and General Contractors
The Digital Foundation

Documentation for the Entire Project Cycle

We provide a single, LiDAR-verified digital baseline, ensuring your architects, engineers, and contractors are perfectly aligned from pre-design to final hand-off.

The Process

Sophisticated tech. Frictionless delivery.

1

Rapid Spatial Capture

We deploy to your site with advanced LiDAR technology. We capture millions of data points with minimal disruption, replacing weeks of manual measuring with a single, highly efficient visit.

2

Data Synthesis

Our processing team transforms the raw spatial data into your required deliverables—including high-fidelity point clouds, 3D walkthroughs, and accurate BOMA/ANSI floor plans.

3

Asset Deployment

Within days, your digital assets are delivered. You receive a link to your hosting package and downloadable files ready for immediate integration into your CAD or BIM software.

Engineered for Accuracy

Protect your schedule.
Protect your budget.

A majority of TI change orders stem from dimensional errors on original plans. We ensure your entire team is building off an undisputed, 100% accurate digital baseline.

  • Sub-inch precision for absolute design confidence
  • Native DWG/DXF files for immediate AutoCAD/Revit integration
  • Virtual reality walkthroughs for remote site inspections
  • Seamless collaboration across AOC teams
  • Fully insured ($2M aggregate) for active construction sites
Speak to our Team
5.0 on Google
“Having a perfectly accurate DWG file of the existing space before we began drawing saved us from at least three major clashes that would have stopped the build.”
Commercial Architect — Salt Lake City
See the Financial Impact

Calculate Your Spatial Certainty ROI

Discover exactly how replacing traditional manual measurements with LiDAR-verified data compresses timelines and eliminates the contingency budget buffer.

View the Process ROI Report
Common Questions

Design & Construction FAQs

What software formats do your CAD/BIM exports support?
Our deliverables are highly compatible. We provide standard DWG and DXF files that map cleanly into AutoCAD, Revit, ArchiCAD, SketchUp, and Chief Architect.
Can you detect plumbing or wiring behind walls?
No. LiDAR relies on line-of-sight capture. We map everything visible within the space with incredible precision, including exposed MEP. However, hidden conditions behind drywall still require physical discovery.
When is the best time in the project lifecycle to scan?
For remodeling and Tenant Improvements, the most critical scan is during the Pre-Design phase to create the as-built baseline. For massive projects, a second scan post-demolition is often utilized before rough-ins begin.
How does this reduce change orders?
A majority of TI change orders stem from dimensional errors on the original plans (e.g., custom millwork ordered based on an assumed 10-foot wall that is actually 9'10"). Our data ensures the design is built on reality, not assumptions.

Discuss your next project.

Connect with our team to discuss how LiDAR scanning can compress your specific project timeline and budget.

contact@formperspectives.com
(801) 893-1053
Serving the Wasatch Front & Back

Contact Us

Send us the details of your upcoming build or renovation.

Insights

From the Blog

Loading posts...